Oz and Mozart Users Mailing List

[Oz] vb interface and job-shop modelling


From: Adriano Volpones (volpadri@tin.it)
Date: Tue Jan 02 2001 - 15:32:38 CET


Hi (and happy new year to you all)

I am a new Oz developer involved in a complete reengineering of a job-shopscheduling application written in VBasic.

I'm already developing with IF-Prolog but not completely satisfied for:

  1 - the hard task of express non trivial problems in prolog

  2 - the absence of a start-stop-resume function

  3 - the extremely difficult task of debugging and visualizing the costraints and vars database

  4 - the absence of a distributed model (to be developed from scratch)

 

So before starting the hard work I need some suggestions or examples about:

  1 - the method of interfacing with VBasic

  2 - some non trivial scheduling models:

      a - groups of non-equivalent machines (alternative) with different capacity

      b - calendars of availability fo machines (breaks)

      c - families of tasks with the same setup to be grouped to minimize the numb. of setups

 

Thanks in advance,

                         Adriano Volpones

-
Please send submissions to users@mozart-oz.org
and administriva mail to users-request@mozart-oz.org.
The Mozart Oz web site is at http://www.mozart-oz.org/.



This archive was generated by hypermail 2b29.